Some houses begin with a sense of belonging
There are places that, from the moment you enter, make you feel something different. Mevo Modi’im is one of them.
The village lies in the heart of the Ben Shemen Forest, surrounded by trees and green scenery, close to Modi’in. But what truly distinguishes it is not only the location. It is the community, the heritage and the atmosphere — the combination of rural life with a tradition of music, prayer, love of one’s fellow Jew and human connection.
The fire that struck the village in 2019 left behind loss and pain, but also a will to rebuild and to renew life in the place. For us, the opportunity to take part in that renewal was far more than a real estate deal.
Ten houses. One special community.
The project includes five plots, on each of which two semi-detached houses are planned. In total, ten ground-level houses with areas of about 180–210 sq.m. per house.
The concept is to create spacious houses suited to family life and to the rural environment: a place where the home is not cut off from its surroundings, but is part of community life, nature and the character of Mevo Modi’im. The small number of houses makes the project intimate and exclusive.
From an approved master plan to a building permit
When we entered the project, the land already had an approved master plan. We identified the possibility of advancing the plots to the next stage: detailed planning and obtaining building permits for the houses.
We bought the land in a tender, brought in professionals and advanced the licensing process until the permits were obtained. In this way we created value even before construction itself — by reducing planning uncertainty and bringing the land to a state that allows execution to begin.
This is one of the important principles of SAFELAND: not every value enhancement requires a change to the master plan. Sometimes the value is created by advancing land already designated for residential use through to the permit and realization stage.
Two last houses
The project now has two semi-detached houses left, with building permits, in a green and sought-after location within an exceptional community setting. A contractor has not yet been selected and construction work has not yet begun. The planned execution period is about 18–24 months from the start of works.